Scheduled reports Coming soon
Run a report on a timetable and email the workbook
Coming soon. This tool is built and shows on its menu, but it does not open in a released build yet. This page describes it as it will ship.
A scheduled report runs by itself in your own Azure subscription, with the options you chose on the report's page, and emails the workbook to the people you pick. Your PC does not need to be on. The workbook goes from your Azure to your mailboxes; it never passes through ShareMaster's servers.
Reads only. Nothing in SharePoint is changed.
What does it tell you?
- Which reports can be scheduled: the ones whose page shows Schedule this report. Today that is the Custom report builder and saved reports, Inactive workspaces, Entra security, Groups, Unused licences and the Teams report. The others need more work before they can run unattended.
- When it runs: every day, every week on one day, or one weekday of every month (for example the first Monday), at a time in the time zone you choose. A run the reports app missed is caught up once, marked late, never several times.
- Who gets it: up to 20 addresses or mail-enabled groups. Addresses outside your organisation are refused unless you tick Allow people outside, and the reports app checks again when it sends.
- How it arrives: a small workbook is attached. A large one is put in the ShareMaster Reports library on the site chosen at setup and the email links to it, so Microsoft 365 permissions decide who can open it. There are no anonymous links.
- What you can do afterwards: on Reports › Scheduled reports, Run now, Pause or Resume, Edit, Delete, see each schedule's runs, open a run's workbook, Resend it to the same people, and copy finished runs into History.
How it runs
- Set it up once. Reports › Scheduled reports. The first time, set up scheduled reports for your tenant: it creates the reports app and its storage in your Azure subscription. See Setting up scheduled reports.
- Fill in the report as usual. Open the report, choose its options exactly as you would to run it now.
- Schedule this report. Next to Run report, or in the dialog when a run finishes. The schedule keeps those options exactly; Change options goes back to the report's page.
- When, who, how. Pick the timetable, add recipients, choose the format and whether to always link instead of attaching. The page shows the next three runs.
- Check and save. The last step says the whole schedule in one line. Save writes it to your Azure storage; Run now asks for a first run straight away so you can check the email arrives.
Read next
- Setting up scheduled reports: What setup creates in your Azure subscription and why.
- Why a scheduled report could not read a site: What Partial and Not read mean on a scheduled run.
- History: Where copied scheduled runs appear, under Scheduled.